Thursday, November 6, 2008

My proposal for the H2O Water Project

These dates are represented of the "tide calander" project of HTHMA and is not expected to change. This guide was formed by Sydney for the whole group to follow, as well as my  parts that I have to do that I put in.

November 7- Research important dates/ areas of photography

November 8/9/10/11: Take pictures at assigned locations.  Jake will finnish up research and show what he has on the graphics for the tide.
November 12: Review Picture and Retake pictures if necessary (if not done already, finnish up making all tide graphics) when done with tide graphics, start making calander
November 13: Pick finalized pictures. have one main photograph and also 1-2 smaller photographs on the calender page.
November 14/15/16: Begin working on paragraphs. Have rough drafts for all paragraphs by beginning of class on the 17th. Find " Did you know fact" for each of your locations. Calander layout in In-Design must be done (14=fri, 16=sun) prefably friday

November 17: Begin basic layout/in design spread sheet.
November 18: Insert Pictures into layout/in design sheet. 
November 19: Insert Calendar with tide information
November 20: Insert paragraphs into layout/in design sheet
November 21: Insert facts/dates/did you know facts. Complete draft of calendar ready for critique.

November 22-30= Thanksgiving Break

December 1-2: Critiques for content
December 3-4: Critiques for Aesthetic Appeal
December 5: Send to Printer
and I am not in the picutre project but the picture scheduel is bellow:

Months:
1 Jade: Mission Bay/ Fiesta Island
2 Jade: De'anza Cove
3 Jade: Mission Bay/Aquatic Center
4 Jeremy: Del Mar
5 Jeremy: Chula Vista Marina
6 Jeremy: Coronado
7 Sydney: San Diego Bay
8 Sydney: I.B./Chula Vista
9 Sydney: Seaport Village
10 Rodrigo: OB Pier
11 Rodrigo: H&M Landing/Shelter Island
12 Rodrigo: San Diego River mouth 